COMPLETED PROJECTS

LIST OF SUCCESSFULLY COMPLETED CIVIL PROJECTS

Sr.No
SITE DESCRIPTION
CLIENT
LOCATION
Value in SAR
1
Construction of 132 KV DC Over Head Transmission Line for Residential S/S and Phosphate S/S
Al Babtain Contracting Co.
Waad Al Shamaal
12 M
2
Construction of 132 KV DC Over Head Transmission Line for Juba S/S
Al Babtain Contracting Co.
Waad Al Shamaal
8 M
3
King Khlid Airport Project – VIP Alforsan Lounge KKIA-TR2
Unidecore
Riyadh
12 M
4
Al Harmain High Speed Railway BTS Tower Project
Indra
Madinah
5M
5
Construction of 132 KV Terminal Compounds for Residential & Phosphate S/S
Al Babtain Contracting Co.
Waad Al Shamaal
1 M
6
Hard Land Scapping In Princess Noora University Riyadh
Al-saif Engineering & Contracting
Airport Road Riyadh
3.95 M
7
Earth Work or Leveling And Grading For Line – 3
Riyadh Cement Co.
Muzahimiyah
5.2 M
8
Mass Excavation/Back Filling For Line-ii City Cement
Sinoma International
City Cement Plant
1.3 M
9
Waterline Project – (Hail City Project)
Aziz Company
Hail
4.7 M
10
Construction Of Sport & Parking At Riyadh Cement Plant
Riyadh Cement Company
Muzahimiyah
5.3 M
11
RCC-Silo Construction Work (2 Nos. Cement Silo)
Sinoma International
Muzahimiyah
1.6 M
12
Construction Of Internal Road Of Riyadh Cement Plant
Riyadh Cement Company
Muzahimiyah
2.81 M
13
Interior Finishing And Wood Work 100 Villas Inside RCC Compound
Riyadh Cement Company
Muzahimiyah
4.2 M
14
Construction Of Road Inside Residential Compound RCC 27000m2
Riyadh Cement Company
Muzahimiyah
1.5 M
15
Parking Area Asphalting Work
Riyadh Cement Company
Muzahimiyah
4.5 M
16
Paint Work with 1000 microns on more than 100000+ sq.m on Line 3 Viaduct
Ar Riyadh New Mobility
Riyadh
11 Million
17
Laying of Track 43km on Line 3 with the joint venture of Salcef Salini
Riyadh New Mobility
Riyadh
149 Million
18
Installation of Complete Handrail on both sides of Viaduct at Line 3
Ar Riyadh New Mobility
Riyadh
59 Million
19
Straycurrent System and the Earthing & Bonding of Complete Line -3
Riyadh New Mobility
Riyadh
75 million
20
Casting of Track Slab of Line 1 & Line 2 of Riyadh Metro Project Exclusively
BACS
Riyadh
119 Million
21
Rear Work of Line 1 & Line 2 of Riyadh Metro Project Exclusively
BACS
Riyadh
47 Million
22
Building Management System of 27 Stations
Ar Riyadh New Mobility
Riyadh
19 Million
23
Construction of 110 KV Over Head Transmission Line for Yanbu SWCC To Prop Gantry At Al Muajiz Term. Side
Al Babtain Contracting Co.
Yanbu
10M
24
Construction of 115 KV Over Head Transmission Line for Fadhili Industrial Support Facilities
Al Babtain Contracting Co.
Jubail
8 M